01. Who Did We Help
Turner Construction and the AGI team have formed a successful, hard-working and decades-long partnership. Together, we develop and execute complex transit and arena projects, like this one at Levi’s Stadium, home of the San Francisco 49ers.
Locations Completed
1,250
Number of Signs
268
Average Project Length
3.5 Months
Steel Used
3.5k Tons
02. The Challenge
With design only 20% complete and significant deadlines approaching, AGI stepped in to design, fabricate and install over $15 million in signage and wayfinding- all before the kick-off of the 49er’s season opener.
03. Our Solution
With a timeline this tight, and stakes this high, AGI pulled together the critical resources to get the job done on time. Field managers stayed in Santa Clara for the duration of design and installation to provide real-time technical survey and condition reports as the work evolved day by day. Simultaneously, our project managers, engineers and fabricators worked in collaborative design sessions eliminating several steps from the typical design and manufacturing process, and fast-tracked our speed to production.
04. The Results
The 49ers were ready to perform on opening day, and so was their new signage. The stadium opened on time with all sponsorship, wayfinding, concession and luxury box signage fully functional, expertly installed and shining examples of the work our partnership can produce.